Friday, March 30, 2012

all the unit 3 stuff



















3.2.3 very very time consuming but once i got the hang of it went through quick except i held off the last two
3.2.4 a lot easier since all you had to do was just plug in things to the given equations
3.2.6 I liked using all the things given to figure out just what beam it was and md solids is a cool program
3.2.9 once again kinda time consuming, but there wasnt many problems, but it made me see more real life use

Thursday, March 8, 2012

Loads

1. In this project we figured out which beams we should be using for specific specifications
2.

3.i liked puting the beams up and watching the building get more specific, I diliked how hard it was
if i could change the project it would be to make it easier

Thursday, March 1, 2012

KEYSTONE LIBRARY





I loved this project, changing the library from nothing to something, i didnt like making useless rooms, but i wouldnt change anything about the project

Monday, February 27, 2012

Roof Research And Section View



Keystone Commercial Floor

In this we use the info from the sheet yesterday to add a floor to the second level
I liked this because it was cool taking this building from nothing to something
I didnt like getting it to work right with the floor beams
I wouldve put it in a better area like have the building work better with it

Card Buildings- Dan Matt and Mike



In this project we constructed a structure out of playing cards and tape.  We tried to make the strongest structure with the least mass.  Our preliminary structural efficiency rating was 165.76 pounds.  To increase our number, we took off lots of tape and decreased the mass of our structure. We got second in our class.  Joe's structure got first.  The cylinder tube model worked the best.

Tuesday, February 7, 2012

Commercial Walls Systems

1. in this project we learned about different types of walls and the advantages and disadvantages of them

2.
3. I liked this project, I liked putting the new wall up and making it more finished, i didnt like finding the thickness of things, there isnt really anyuthing different id do in this project

Monday, January 23, 2012

Affordable House - Electrical Systems

1.In this part of the project we drew in the electrical systems on a copy of our site plan.
2.
3. I didnt like that there were a bunch of regulations, but i guess its good that we have them, I like putting the electrical systems in though because it makes the house look more finished, I wouldn't do anything different in this part

Wednesday, January 18, 2012

Affordable House - Support Drawings

1. We drew in the plumbing lines in our site plan
3. I liked this it was interesting putting in the plumbing lines iin, its as if we were putting in the finishing details of our house, i liked learning about where they all go i disliked how you could need a lot of pipe if i could do this deifferently i would print my floor plan largwr

Wednesday, January 11, 2012

Affordable House - Site Plan

1. I put my house on the lot for it and leveled it out and put in the water and sewer lines that were needed and showed the setback lines
3. I liked this project alot i liked getting our house finally on the lot and looking more final, i didnt like how the house started way below and i had to movie it up, I would look at what more edits we have to do to our house before we place it.

Tuesday, January 10, 2012

Affordable House-Revit Drawings

1. For this project we made a house for habitat for humanity, we followed certains restriction. After we made the house we put them on 4 sheets that basically give a designer a idea of how to put the house together.










3. Overall I really liked this project! its cool how we have all these sheets where we could basically use them to put this house together.